For most of the 20th century, natural gas was a regional fuel. It moved by pipeline, so a gas field far from customers was worth little. Liquefied natural gas changed that. Cool methane to about −162 °C and it turns into a clear liquid around 600 times smaller than the gas, light enough to carry in a tanker from Qatar to Japan or from Louisiana to Germany. World LNG trade reached roughly 410 million tonnes in 2024, according to the International Gas Union, about 13% of global gas consumption. This guide follows a molecule along the chain and shows where the costs and losses sit.
Step 1: upstream gas and pre-treatment
LNG starts like any gas supply, with wells offshore or onshore (see natural gas from well to stove). Before gas can be liquefied it must be extremely clean, because anything that freezes above −162 °C would block the heat exchangers. The plant removes:
- CO₂ and hydrogen sulphide, using amine solvents. CO₂ must come down to around 50 ppm.
- Water, with molecular sieves, to below 1 ppm.
- Mercury, which attacks aluminium heat exchangers.
- Heavier hydrocarbons (ethane, propane, butane, condensate), which are often sold separately and can be very valuable.
Some fields contain a lot of CO₂. Gorgon in Australia was built with one of the world’s largest CO₂ injection projects for that reason, though it has injected far less than planned.
Step 2: liquefaction trains
A liquefaction plant is built in parallel units called trains, each a self-contained refrigeration process. A modern train produces 4 to 8 million tonnes per annum (MTPA). Most use mixed refrigerants (propane plus a blend of methane, ethane and nitrogen) in cascading loops driven by large gas turbines or electric motors.
Liquefaction is the most expensive and energy-hungry link. It typically burns the equivalent of about 8 to 12% of the incoming gas, and building a large plant costs billions of dollars. Global nameplate liquefaction capacity was around 490 to 500 MTPA at the end of 2024 (IGU), with a large wave under construction in the US and Qatar.
| Exporter (2024) | LNG exports, approx. (Mt) | Main sites |
|---|---|---|
| United States | ~88 | Sabine Pass, Corpus Christi, Cameron, Freeport, Calcasieu Pass, Plaquemines |
| Australia | ~80 | North West Shelf, Gorgon, Ichthys, Gladstone (Queensland) |
| Qatar | ~77 | Ras Laffan |
| Russia | ~33 | Yamal, Sakhalin |
| Malaysia | ~26–27 | Bintulu, floating LNG |
Figures are rounded from the IGU World LNG Report 2025 and differ slightly between sources. Qatar is expanding Ras Laffan from 77 to about 142 MTPA by around 2030 through the North Field East and South projects, and US capacity is set to roughly double between 2024 and the end of the decade.
Malaysia’s LNG business
Malaysia has been an LNG exporter since 1983. The PETRONAS LNG Complex in Bintulu, Sarawak, has nine trains and a combined capacity of roughly 29 to 30 MTPA, making it one of the largest single liquefaction sites anywhere. Most cargoes go to Japan, China, South Korea and Taiwan under long-term contracts.
PETRONAS also pioneered floating LNG. PFLNG Satu (about 1.2 MTPA) started in 2017 offshore Sarawak, and PFLNG Dua (about 1.5 MTPA) in 2021 offshore Sabah, liquefying gas from fields too small or remote for a pipeline. Malaysia also imports LNG into Peninsular Malaysia through regasification terminals at Sungai Udang in Melaka and at Pengerang in Johor, because the gas fields off Sarawak and Sabah are not connected to the peninsula by pipeline. See the Malaysia country profile and the LNG dashboard.
Step 3: shipping
LNG travels in double-hulled carriers with heavily insulated tanks. A standard modern carrier holds about 174,000 m³ of LNG, roughly 75,000 to 80,000 tonnes, carrying gas equivalent to roughly 1.2 TWh of energy. Qatar’s Q-Max ships hold up to 266,000 m³. The global fleet passed 750 vessels in 2024.
No insulation is perfect. A small fraction, about 0.1% per day on newer ships, warms and evaporates as boil-off gas. Most carriers burn it in their engines, so it powers the voyage rather than being wasted. Some ships reliquefy it.
Boil-off over a 20-day voyage at 0.1%/day ≈ 2% of the cargo
Step 4: storage and regasification
At the import terminal, LNG is pumped into insulated tanks, then warmed back to gas using seawater, air heaters or burners, and sent into the pipeline grid. Regasification uses about 1 to 2% of the energy. Large importers such as Japan, China and South Korea have dozens of onshore terminals; the world had over 1,000 MTPA of regasification capacity in 2024, more than double liquefaction capacity, because importers want spare room for peak demand.
Floating storage and regasification units (FSRUs) are converted or purpose-built ships that do the same job at a jetty. They take months to install, not years. After Russian pipeline gas to Europe collapsed in 2022, Germany opened its first FSRU at Wilhelmshaven in December 2022, less than 10 months after the decision. Italy, Finland, the Netherlands and others followed.
| Importer (2024) | LNG imports, approx. (Mt) |
|---|---|
| China | ~77 |
| Japan | ~66 |
| South Korea | ~47 |
| India | ~27 |
| Taiwan | ~22 |
Europe as a whole imported well over 100 Mt in 2024, making it the largest importing region after Asia.
Contracts, prices and costs
Traditional LNG sales are long-term contracts of 15 to 25 years, often priced as a percentage of the oil price. US exports are usually priced at Henry Hub plus a fixed liquefaction fee, and a growing spot market is priced off the Platts JKM benchmark in Asia and TTF in Europe. The details are in how gas prices are set.
These are illustrative figures from typical contract structures, not a quote. Compare them with live hub prices on the natural gas prices page.
The climate question
LNG burns like any natural gas, but the chain adds emissions: fuel for liquefaction, boil-off, shipping and methane leaks upstream. Its life-cycle footprint is usually 10 to 20% higher than pipeline gas, and higher still if upstream methane leakage is large. Newer plants electrify compressors with grid or renewable power, and some capture CO₂. In Asian power systems LNG often replaces coal, which cuts emissions, but it also competes with solar, wind and storage. The broader debate is in natural gas and the energy transition.
In short
LNG turns gas into a global commodity by cooling it to −162 °C. Liquefaction is the costly, energy-hungry step; shipping and regasification are cheaper. The US, Australia and Qatar dominate exports, and Malaysia’s Bintulu complex has been a major supplier to Asia for four decades. Convert between tonnes of LNG, cubic metres, MMBtu and kWh with the gas unit converter or energy unit converter, and read more on the fuel itself in the LNG glossary entry.
Calculators for this topic
Frequently asked questions
What is LNG?
Which countries export the most LNG?
How much energy is lost in the LNG chain?
What is an FSRU?
Is LNG dangerous?
Where does Malaysia make its LNG?
Sources & references
Figures in this guide are typical ranges drawn from the sources above; your own numbers depend on location, prices and equipment. Use the linked calculators for site-specific estimates.