How Malaysia's Electricity System Works: TNB, SESB, SEB

Malaysia's three power grids, the Single Buyer, IPPs, the regulator, generation mix, how TNB tariffs and the fuel adjustment are set, and what CRESS changes.

Updated 6 min read 1,378 words

Most Malaysians know electricity as a monthly TNB, SESB or SEB bill. Behind it sits a system of three separate grids, dozens of privately owned power stations, a central buyer, a regulator and a tariff formula that changed significantly in 2025. This guide explains who does what, where the power comes from and how the price on your bill is set.

Current tariffs and data are on the Malaysian electricity page and the TNB tariff page; the national profile is on Malaysia’s country page.

Three grids, three utilities

Malaysia does not have one national grid. The South China Sea separates the peninsula from Borneo, and Sabah and Sarawak run their own systems.

Region Utility Ownership Main sources
Peninsular Malaysia Tenaga Nasional Berhad (TNB) Listed, government-linked (Khazanah and others) Coal and gas, plus hydro and growing solar
Sabah and Labuan Sabah Electricity Sdn Bhd (SESB) TNB subsidiary, with plans to transfer to the Sabah state Mostly gas, some hydro and diesel
Sarawak Sarawak Energy Berhad (SEB) Sarawak state government Mostly hydropower, plus gas and coal

Peninsular Malaysia is by far the largest system, with installed capacity of 27,333 MW and a record peak demand of 21,049 MW on 28 May 2025, according to the Energy Commission’s statistics dashboard. The peninsular grid connects to Thailand in the north and Singapore in the south. Sarawak links to West Kalimantan in Indonesia and exports hydropower there.

Who does what in Peninsular Malaysia

The peninsular power sector is a single-buyer model, not a competitive market:

  • Suruhanjaya Tenaga (Energy Commission) regulates the sector in Peninsular Malaysia, licenses generators and recommends tariffs for government approval under the Electricity Supply Act 1990. Sabah has had its own regulator, the Energy Commission of Sabah (ECoS), since January 2024, and Sarawak regulates electricity under state law.
  • Generators: TNB’s own plants plus independent power producers (IPPs). Malaysia’s first IPPs, such as YTL Power and Genting Sanyen, were licensed in the early 1990s after blackouts in 1992. Today IPPs own more than half of peninsular capacity, mostly under long-term power purchase agreements with capacity and energy payments.
  • Single Buyer: a ring-fenced department within TNB since 2012 that runs least-cost planning and scheduling, buys from all generators and passes costs to the grid.
  • Grid System Operator (GSO): runs the high-voltage system in real time, balancing supply and demand and keeping frequency at 50 Hz. See grid frequency and balancing.
  • TNB Grid and TNB Distribution: own and run transmission (500 kV, 275 kV and 132 kV) and distribution networks, and sell to customers.

New capacity is procured through tenders run by the Energy Commission, such as Large Scale Solar (LSS) rounds and gas-fired plant tenders. Since 2023 Malaysia has also allowed cross-border sales of renewable power through Energy Exchange Malaysia (ENEGEM).

Where the electricity comes from

National generation in 2023–2024, rounded from Ember and Energy Commission data:

Source Share Main plants
Coal ~45% Manjung (Janamanjung, about 4.1 GW), Tanjung Bin, Jimah, Kapar
Natural gas ~34% Combined-cycle plants at Pasir Gudang, Prai, Kapar, Track 4A, SESB plants in Sabah
Hydropower ~17–18% Bakun 2,400 MW, Murum 944 MW and Batang Ai in Sarawak; Pergau 600 MW and Kenyir (Sultan Mahmud) 400 MW in the peninsula
Solar ~2% (plus rooftop self-consumption) LSS farms, rooftop solar under NEM and Solar ATAP
Other ~1% Biomass, biogas, diesel

Coal is almost all imported, mainly from Indonesia and Australia. Gas comes from offshore fields in Peninsular Malaysia, Sabah and Sarawak, plus LNG imported through the Melaka and Pengerang regasification terminals. In Sarawak hydro supplies most electricity, which gives the state one of the lowest-carbon grids in Southeast Asia and some of the cheapest industrial power, a draw for aluminium smelters and data centres.

See all large plants on the power plants map.

How the tariff is set

Since 2014 TNB’s tariffs have been set under Incentive-Based Regulation (IBR). The Energy Commission fixes allowed revenue for TNB’s regulated businesses for each regulatory period, covering operating costs, depreciation and a return on assets, with incentives for meeting reliability targets. Fuel and generation costs are passed through separately.

For Regulatory Period 4 (RP4, 2025–2027), the government approved an average base tariff of 45.40 sen/kWh for Peninsular Malaysia. From July 2025 the domestic tariff changed structure:

Component What it pays for
Energy charge Fuel and generation costs, with a lower rate up to 1,500 kWh a month and a higher rate above
Capacity charge The cost of keeping power plants available
Network charge Transmission and distribution
Retail charge Billing and customer service (fixed, waived for low users)
Automatic Fuel Adjustment (AFA) Monthly surcharge or rebate for changes in fuel costs
Energy efficiency incentive Rebate for low monthly use

The Automatic Fuel Adjustment replaced the old Imbalance Cost Pass-Through (ICPT), which was reviewed every six months. AFA applies monthly; the Energy Commission can set it within ±3 sen/kWh, and larger moves need government approval. In 2026 it swung from a rebate of 4.99 sen/kWh in January to a surcharge of 3.60 sen/kWh in November. Service tax of 8% applies to the part of domestic usage above 600 kWh a month, and the 1.6% renewable energy fund levy (KWTBB) applies above 300 kWh.

Worked example: what drives the energy part of a bill Household using 400 kWh a month, assumed all-in rate ≈ 45 sen/kWh Base bill ≈ 400 × 0.45 = RM180 AFA at +1 sen/kWh: 400 × 0.01 = +RM4 AFA at −2 sen/kWh: 400 × (−0.02) = −RM8 Cutting 50 kWh (e.g. AC setpoint +2 °C): 50 × 0.45 ≈ −RM22.50

The rates here are illustrative; use the electricity bill calculator and the current schedule on the TNB tariff page. For the general method, see how to read your electricity bill.

Malaysian tariffs are low by international standards because fuel costs have historically been held down. Gas sold to the power sector has long been priced below market under a regulated price, and the government has absorbed fuel cost increases at times through the Kumpulan Wang Industri Elektrik fund. Read fossil fuel subsidies explained.

Rooftop solar, green tariffs and CRESS

Customers who want cleaner power have several routes:

  • Solar ATAP (from 1 January 2026, replacing net energy metering, which closed in mid-2025): install rooftop panels and use the power yourself; homes are credited for exports at the energy charge rate, businesses at the average system marginal price, with credits usable only in the same billing month, for up to 10 years. See Malaysian solar.
  • Green Electricity Tariff (GET): pay a premium per kWh to TNB for renewable energy certificates matched to your consumption.
  • Corporate Renewable Energy Supply Scheme (CRESS): launched in September 2024 (applications through the Single Buyer from 30 September 2024), it lets businesses buy power from a renewable developer and use the TNB grid for delivery, paying a system access charge. It is Malaysia’s first form of third-party access to the grid.

Large solar is procured through LSS tenders: LSS5, launched in 2024, offered 2,000 MW, and LSS6 around 2.5 GW of solar paired with batteries.

Changes on the way

The National Energy Transition Roadmap targets 70% renewable capacity by 2050 and no new coal plants. In practice that means:

  • More solar and battery storage on the peninsular grid, and more grid reinforcement;
  • New gas plants to replace retiring coal;
  • More interconnection with Thailand, Singapore and Sarawak, and a role in the ASEAN Power Grid (see energy in Southeast Asia);
  • Fast-rising demand from data centres in Johor and the Klang Valley, which has led TNB and the Energy Commission to plan several gigawatts of new capacity.

In short

  • Three grids: TNB (peninsula), SESB (Sabah) and SEB (Sarawak).
  • In the peninsula, IPPs and TNB generate; the Single Buyer buys; the GSO dispatches; TNB delivers; the Energy Commission regulates.
  • Power comes mainly from coal and gas, with hydro dominant in Sarawak.
  • The RP4 base tariff is 45.40 sen/kWh for 2025–2027, with a monthly fuel adjustment since July 2025.
  • Air conditioning is usually the biggest controllable item on a Malaysian bill; see air conditioning and cooling energy.

Calculators for this topic

Frequently asked questions

Who supplies electricity in Malaysia?
There are three main utilities: Tenaga Nasional Berhad (TNB) in Peninsular Malaysia, Sabah Electricity Sdn Bhd (SESB) in Sabah and Labuan, and Sarawak Energy Berhad (SEB) in Sarawak. TNB owns the Peninsular transmission and distribution networks and sells to almost all customers there, while independent power producers own a large share of generation.
What is the Single Buyer?
The Single Buyer is a ring-fenced unit, set up in 2012, that plans and buys electricity from all generators in Peninsular Malaysia under power purchase agreements and dispatch rules, and sells it to TNB's grid business. It handles least-cost scheduling, while the Grid System Operator runs the network in real time.
What is the base tariff in Malaysia for 2025 to 2027?
Under the fourth Regulatory Period (RP4) of the Incentive-Based Regulation framework, the Peninsular average base tariff was set at 45.40 sen/kWh for 2025 to 2027. The new tariff structure for domestic users took effect in July 2025, splitting the bill into energy, capacity, network and retail charges.
What is the Automatic Fuel Adjustment (AFA)?
AFA is a monthly surcharge or rebate, applied from July 2025, that passes changes in fuel and generation costs through to bills. It replaced the six-monthly Imbalance Cost Pass-Through (ICPT). The Energy Commission can move it automatically within ±3 sen/kWh; larger changes need government approval. Domestic users at or below the protection threshold (600 kWh a month, raised to 800 kWh for September to December 2026) pay no AFA.
Where does Malaysia's electricity come from?
Nationally, in 2025 about 45% came from coal, 34% from natural gas, about 17% from hydropower and around 2% from solar (Our World in Data, based on Ember and the Energy Institute). Peninsular Malaysia relies mainly on coal and gas, Sabah mainly on gas, and Sarawak mainly on hydropower.
Can a company in Malaysia buy renewable electricity directly?
Yes, since 2024 through the Corporate Renewable Energy Supply Scheme (CRESS). A company signs a contract with a renewable developer, the power is delivered over the TNB grid, and the company pays a system access charge to TNB. Green Electricity Tariff (GET) subscriptions from TNB are another option.

Sources & references

  1. Suruhanjaya Tenaga: Malaysia Energy Statistics Handbook and Peninsular Malaysia Electricity Supply Industry Outlook
  2. Tenaga Nasional Berhad: Tariff and pricing
  3. Single Buyer Malaysia
  4. Sarawak Energy Berhad: Generation portfolio
  5. Ember: Malaysia electricity data

Figures in this guide are typical ranges drawn from the sources above; your own numbers depend on location, prices and equipment. Use the linked calculators for site-specific estimates.