Glossary · Nuclear

Reprocessing (spent fuel)

Chemically separating uranium and plutonium from spent nuclear fuel so they can be reused, leaving a smaller volume of high-level waste.

The standard PUREX process dissolves spent fuel in nitric acid and extracts uranium and plutonium with solvents. France’s La Hague plant, with a nominal capacity of about 1,700 tonnes a year, is the largest. Russia, India and the UK (Sellafield, until 2022) also reprocess; Japan’s Rokkasho plant has been delayed for decades.

Reprocessing cuts high-level waste volume and reuses about 96% of the material in spent fuel, but it is costly and separates plutonium, raising security issues. The United States has not reprocessed commercial fuel since the 1970s. See nuclear waste facts.

Related terms

All terms →
  • MOX fuel

    Mixed oxide nuclear fuel combining plutonium recovered by reprocessing with depleted or natural uranium.

  • Spent nuclear fuel

    Fuel assemblies removed from a reactor after use, highly radioactive and thermally hot, containing uranium, plutonium, fission products and minor actinides.

  • High-level radioactive waste

    Spent nuclear fuel and the highly radioactive residues from reprocessing; about 3% of nuclear waste by volume but around 95% of its radioactivity.

  • Deep geological repository

    An engineered underground facility, typically 300–700 m deep in stable rock or clay, designed to isolate high-level radioactive waste for hundreds of thousands of years.