Power plants & fossil calculator

Nuclear fuel calculator: burnup, uranium, SWU and fuel cost per MWh

How much enriched fuel, natural uranium (U₃O₈) and separative work a reactor needs each year from its power, efficiency, capacity factor and burnup, and what the front-end fuel cycle costs per MWh.

Editable share link Branded PDF report Free · no sign-up

Results

A 1,000 MWe reactor at 90% capacity factor produces 7.88 TWh a year from about 22.1 t of fuel enriched to 4.4% U-235 (48 assemblies). That needs 199 t of natural uranium (0.52 million lb U₃O₈) and 147 thousand SWU. The front-end fuel cycle costs about 11.93 € per MWh.
Fuel loaded per year
22.1tU
48 fuel assemblies of 460 kgU
Natural uranium needed
199tU
235 t U₃O₈
Separative work
147thousand SWU
6.66 SWU per kg of product
Thermal power
3,030MWt
Annual generation
7.88TWh
Fuel cost per MWh
11.93€/MWh
1.19 €-cents per kWh
Annual fuel cost
94million €
Spent fuel (heavy metal)
22.1t/yr
2.8 g per MWh
Coal for the same electricity
2.89Mt/yr
38% efficient plant, 25.8 GJ/t
LNG for the same electricity
1.01Mt/yr
57% efficient CCGT
Fuel cost breakdown (€/MWh)
Enriched fuel per year vs burnup

Annual fuel cycle quantities

StepQuantityUnit costAnnual cost
Uranium (U₃O₈)235 t U₃O₈80 €/lb€41,417,379
Conversion to UF₆199 tU60 €/kgU€11,948,334
Enrichment147 thousand SWU170 €/SWU€25,053,915
Fabrication22.1 tU350 €/kgU€7,742,424
Back end / waste fee7.88 TWh1 €/MWh€7,884,000
  • Equilibrium-cycle estimate: real reload batches, first cores and stretch-outs differ. Conversion and fabrication losses (≈ 0.5% each) are ignored.
  • Prices are indicative and move a lot; check current U₃O₈, conversion and SWU indicators before using the cost figures.

How this calculator works

A nuclear reactor is a heat source like any other thermal plant, but its fuel is counted differently. Instead of a calorific value per tonne, nuclear fuel has a burnup: the thermal energy, in megawatt-days, extracted from each kilogram of uranium before the fuel leaves the core. Once you know a reactor’s thermal output, its capacity factor and the burnup its fuel reaches, the yearly fuel requirement follows directly.

The calculator then works back up the fuel cycle. Enriched fuel needs a larger mass of natural uranium as feed and an amount of enrichment work measured in separative work units (SWU). Natural uranium is bought as U₃O₈ and converted to UF₆ before enrichment. Prices for each step give the front-end fuel cost per MWh.

The formula

Thermal power (MWt) = MWe ÷ net efficiency Thermal energy (MWd/yr) = MWt × 365 × capacity factor Fuel loaded P (kgU/yr) = MWd ÷ burnup (MWd/kgU)

Natural feed F = P × (x_p − x_t) ÷ (x_f − x_t) x_f = 0.711 % Tails T = F − P SWU = P·V(x_p) + T·V(x_t) − F·V(x_f) V(x) = (2x − 1) · ln(x ÷ (1 − x))

U₃O₈ (kg) = F × 1.1792 1 kg = 2.2046 lb

The value function V(x) is the standard way to measure enrichment work, independent of the technology (centrifuges today, gaseous diffusion historically). For a natural-uranium reactor such as CANDU, no enrichment is needed and feed equals the fuel loaded.

Worked example

The defaults describe a 1,000 MWe PWR with 33% net efficiency, a 90% capacity factor and fuel enriched to 4.4% U-235 that reaches 45 MWd/kgU, with 0.25% tails.

  1. Thermal power: 1,000 ÷ 0.33 = 3,030 MWt.
  2. Thermal energy: 3,030 × 365 × 0.90 = 995,500 MWd a year.
  3. Fuel loaded: 995,500 ÷ 45 = 22.1 tU, about 48 assemblies of 460 kg.
  4. Feed: 22.1 × (4.4 − 0.25) ÷ (0.711 − 0.25) = 199 tU of natural uranium, or 235 t of U₃O₈ (0.52 million lb).
  5. Separative work: 6.66 SWU per kg of product, so 147,000 SWU a year.
  6. With U₃O₈ at 80/lb, conversion at 60/kgU, enrichment at 170/SWU, fabrication at 350/kgU and a 1/MWh back-end fee, the fuel costs about 94 million a year, or 11.9 per MWh.

The same 7.9 TWh would take about 2.9 million tonnes of coal in a 38% efficient plant, or about a million tonnes of LNG in a modern combined-cycle plant.

What drives fuel use

Burnup is the main lever. Raising burnup from 33 to 50 MWd/kgU, as the industry did between the 1980s and today, cuts the fuel loaded and spent fuel discharged per year by a third. It needs higher enrichment, though, so natural-uranium needs fall much less. Efficiency matters too. A Gen III+ reactor at 36–37% net efficiency needs about 10% less fuel per MWh than an older unit at 33%. The tails assay is an economic choice: with cheap SWU and expensive uranium, enrichers strip tails down to 0.20% or lower and save feed. The uranium enrichment calculator finds the optimum.

Typical values

Reactor Enrichment Burnup (MWd/kgU) Fuel per year per 1,000 MWe
PWR, current fuel 4.0–4.95% 45–60 18–25 tU
BWR 3.8–4.5% 40–55 20–27 tU
VVER-1000 4.0–4.9% 45–55 20–25 tU
PHWR / CANDU 0.711% (natural) 7–8 130–150 tU
HTGR (pebble bed) 8–17% 80–160 8–12 tU

How to read the results

  • Fuel loaded per year is the mass of fresh fuel the reactor takes in, and also the mass of spent fuel it discharges.
  • Natural uranium is what has to be mined. Compare it with world production of about 50,000–60,000 tU a year to see why a reactor fleet’s needs are modest in tonnage.
  • Separative work shows how much enrichment capacity the reactor occupies.
  • Fuel cost per MWh is the front end plus the waste fee you entered. Fuel is a small share of nuclear generating cost; capital dominates. For the whole picture use the LCOE calculator.

Limitations

This is an equilibrium-cycle estimate. Initial cores, cycle-length changes, power uprates and outages change real reloads from year to year. Process losses in conversion and fabrication (about 0.5% each) and the enrichment of reprocessed uranium or MOX are not modelled. Uranium, conversion and SWU prices move with long-term contracts and spot markets; treat the defaults as illustrative.

Method & assumptions

Thermal power = MWe ÷ efficiency. Thermal energy per year (MWd) = MWt × 365 × capacity factor. Enriched uranium per year = MWd ÷ burnup (MWd/kgU). Natural-uranium feed F = P × (xp − xt) ÷ (xf − xt) with xf = 0.711%. Separative work = P·V(xp) + T·V(xt) − F·V(xf), V(x) = (2x − 1) ln(x / (1 − x)). U₃O₈ = U × 1.1792; 1 kg = 2.2046 lb.

Frequently asked questions

How much uranium does a 1,000 MW nuclear reactor use per year?
A 1,000 MWe pressurised water reactor at a 90% capacity factor loads roughly 20–27 tonnes of enriched fuel a year. Producing that fuel takes about 180–230 tonnes of natural uranium, which is 210–270 t of U₃O₈ (yellowcake). The exact figure depends on burnup, enrichment and tails assay.
What is nuclear fuel burnup?
Burnup is the thermal energy extracted from each kilogram of uranium before the fuel is discharged, usually in megawatt-days per kilogram (MWd/kgU, the same as GWd/tU). Modern light-water reactors discharge fuel at 45–60 MWd/kgU; CANDU reactors on natural uranium reach about 7–8 MWd/kgU.
How much electricity does 1 kg of uranium produce?
At 45 MWd/kgU and 33% efficiency, one kilogram of enriched fuel yields 45 × 24 × 0.33 ≈ 360 MWh of electricity. Measured per kilogram of natural uranium mined, the figure is about 40 MWh, because roughly nine kilograms of natural uranium go into each kilogram of 4.4% fuel.
What does nuclear fuel cost per MWh?
The front end (uranium, conversion, enrichment and fabrication) typically costs 7–15 USD or EUR per MWh at 2023–2025 prices, under a quarter of total generating cost. Uranium itself is roughly 40–50% of that, which is why nuclear power costs are far less sensitive to fuel prices than gas or coal.
How many fuel assemblies does a reactor replace each refuelling?
A typical 1,000 MWe PWR has 157–193 assemblies in the core and replaces about a third of them every 12–24 months. Annually that is about 45–60 assemblies of roughly 0.46 tonnes of uranium each.
How much nuclear waste does a reactor produce?
The spent fuel equals the fuel loaded: about 20–27 tonnes of heavy metal a year for a 1,000 MWe LWR, or about 3 grams per MWh. High-burnup fuel reduces the mass per MWh, while natural-uranium reactors discharge several times more fuel per MWh.

Sources & references

  1. World Nuclear Association — The Nuclear Fuel Cycle and Uranium Enrichment
  2. World Nuclear Association — Economics of Nuclear Power (fuel cost breakdown)
  3. IAEA — Nuclear Fuel Cycle Information System and Power Reactor Information System (PRIS)
  4. OECD NEA / IAEA — Uranium 2022: Resources, Production and Demand (Red Book)

Embed this calculator

Free for blogs, installers, schools and NGOs. Copy the code below; it updates itself automatically.