How this calculator works
Gas turbines are rated at ISO conditions: 15 °C, sea level, 60% relative humidity and full load. Real plants rarely run there. A peaker in a desert summer may lose 15% of its output, and a combined-cycle plant following load overnight might sit at 50–60% load for hours. Both increase gas use per MWh.
This tool starts from the datasheet efficiency and rated output, then applies two generic corrections. The first is a hot-weather derate for ambient temperatures above 15 °C. The second is a part-load penalty that raises the heat rate as load falls. From the corrected heat rate it computes gas flow in MMBtu/h, GJ/h, m³/h, scf and tonnes per hour, along with yearly totals, fuel cost per MWh and CO₂.
The formula
Available output: P_avail = P_ISO × (1 − d × (T_amb − 15)) Ambient heat rate: HR_T = HR × (1 + 0.25 × d × (T_amb − 15)) Part load: HR(L) = HR_T × (1 + k × (1/L − 1))
Gas flow (GJ/h, LHV) = HR(L) × P_avail × L ÷ 1,000 HHV = LHV × 1.108 1 MMBtu = 1.055 GJ m³ = GJ_HHV × 1,000 ÷ HHV (MJ/m³)
Default part-load coefficients k: 0.28 for heavy-duty open cycle, 0.22 for aeroderivatives, 0.12 for F-class combined cycle, 0.10 for H/J class, 0.06 for gas engines. Default hot-weather derates d: 0.6–0.7%/°C for simple-cycle turbines and about 0.45%/°C for combined cycles. Gas engines barely notice ambient temperature, so their derate is set very low.
Worked example
The defaults model a 450 MW F-class combined-cycle plant at 57% LHV, running at 80% load on a 25 °C day for 5,000 hours a year, with gas at 8 per MMBtu.
- At 25 °C the available output is 450 × (1 − 0.0045 × 10) = 429.8 MW; at 80% load the plant delivers 343.8 MW.
- The ISO heat rate of 6,316 kJ/kWh rises 1.1% for temperature and another 3% for part load, to 6,578 kJ/kWh LHV. That is 54.7% efficiency, or 6,909 Btu/kWh on an HHV basis.
- Gas flow is 6,578 × 343.8 ÷ 1,000 = 2,262 GJ/h (LHV), or 2,506 GJ/h (HHV) = 2,375 MMBtu/h, about 64,900 m³ per hour.
- Fuel cost is 2,375 × 8 ÷ 343.8 = 55.3 per MWh; CO₂ is 2,375 × 53.06 kg ÷ 343.8 = 367 kg/MWh.
- Over 5,000 hours: 1,719 GWh, 11.9 million MMBtu (0.33 billion m³) and 630 kt of CO₂.
Switch to the “Peaker 100 MW, 600 h” preset to see the other end: a hot 35 °C day knocks 12% off output, and gas use per MWh is about 50% higher than in the combined cycle.
Typical values
| Plant type | Full-load efficiency (LHV) | Heat rate (Btu/kWh, HHV) | Gas per MWh |
|---|---|---|---|
| H/J-class combined cycle | 60–63% | 6,000–6,300 | 6.0–6.3 MMBtu, ≈ 165 m³ |
| F-class combined cycle | 55–58% | 6,500–6,900 | 6.5–6.9 MMBtu, ≈ 180 m³ |
| Aeroderivative open cycle | 38–42% | 9,000–9,900 | 9–10 MMBtu, ≈ 255 m³ |
| Heavy-duty open cycle | 34–38% | 9,900–11,100 | 10–11 MMBtu, ≈ 285 m³ |
| Gas engine (≥ 5 MW) | 44–49% | 7,700–8,600 | 7.7–8.6 MMBtu, ≈ 220 m³ |
| Microturbine | 25–30% | 12,600–15,100 | 12.6–15 MMBtu |
The US fleet average for gas combined cycles is close to 7,500 Btu/kWh and for gas turbines around 11,000 Btu/kWh, according to EIA. Starts, part load and older units explain the gap with new-plant figures.
How to read the results
- Gas consumption (MMBtu/h) is the number to give a gas supplier or pipeline operator. The m³/h and million scf per day figures cover metric and US gas contracts.
- Efficiency at this point shows how far you are from the datasheet. If it falls more than 10% below full-load efficiency, consider running fewer units at higher load.
- Fuel cost per MWh is the plant’s marginal fuel cost. Compare it with the power price to judge the “spark spread”.
- The part-load table shows why combined cycles prefer to stay above 50–60% load, while gas engines can follow demand with little penalty.
Limitations
The part-load and temperature corrections are generic curves for screening studies. Real machines have stepped behaviour (inlet guide vanes, sequential combustion, units dropping out of a multi-shaft block), and humidity, altitude and inlet or exhaust pressure losses also matter. Start-up fuel is not included: a hot start of a large CCGT can burn several hundred MMBtu before it reaches minimum load. Use the manufacturer’s correction curves for contracts. For other fuels or steam plants, use the heat rate calculator, and to compare gas prices in different units, the energy price converter.
Method & assumptions
Heat rate at ISO full load = 3,600 ÷ efficiency (kJ/kWh, LHV). Above 15 °C available output falls by the hot-weather coefficient per °C and heat rate rises by a quarter of that loss. Part load: HR(L) = HRfull × (1 + k × (1/L − 1)), with k ≈ 0.25–0.3 for simple-cycle turbines, 0.1–0.12 for combined cycles and 0.05 for gas engines. Fuel (GJ/h, LHV) = HR × MW ÷ 1,000; HHV = LHV × 1.108; 1 MMBtu = 1.055 GJ; m³ = GJ (HHV) ÷ heating value.
Frequently asked questions
How much gas does a gas turbine use per hour?
How much natural gas is needed to generate 1 MWh?
What is the difference between OCGT and CCGT fuel consumption?
Why does a gas turbine use more fuel in hot weather?
How efficient is a gas turbine at part load?
How do I convert MMBtu to cubic metres of gas?
Sources & references
- US EPA — GHG Emission Factors Hub (natural gas 53.06 kg CO₂/MMBtu)
- US EIA — Average operating heat rate by prime mover and energy source
- ISO 3977-2 — Gas turbines: standard reference conditions and ratings
- US DOE / NETL — Cost and Performance Baseline for Fossil Energy Plants, Vol. 1 (natural gas combined cycle)