Results

Recommended: a standby-rated generator of 125 kVA (100 kW at PF 0.8). The running load needs 85 kVA with margin, and starting the 15 kW motor draws about 125 kVA, which causes a 13% voltage dip on this set. The deciding factor is engine load during the start.
Recommended generator
125kVA
100 kW at PF 0.8, standby
Running load
71kVA
60 kW at PF 0.85
Required for running load
85kVA
margin, non-linear loads and duty included
Motor starting kVA
125kVA
6.5 × 19.2 kVA running
Required for voltage dip
75kVA
dip limit 20%
Voltage dip on this set
13%
Engine load during start
89kW
needs at least 101 kVA
Running load on the set
56%
Diesel use at running load
23L/h
Voltage dip when the motor starts, by generator size
What sets the size (kVA)

Starting methods for this motor

MethodStarting currentStarting kVAGenerator for the dip limit (kVA)
Direct-on-line (DOL)6.5 × FLC125100
Star-delta2.2 × FLC42100
Soft starter3.5 × FLC67100
Variable-speed drive (VFD)1.2 × FLC23100
  • Screening method: the voltage-dip formula uses the alternator subtransient reactance and ignores the voltage regulator response and engine speed dip. Confirm with the manufacturer's sizing software (motor starting curves, transient response class per ISO 8528-5).
  • If several motors can start at once, enter their combined kW as the largest motor. Sequencing starts, soft starters or drives usually allow a much smaller generator.

How this calculator sizes a generator

Sizing a generator set means passing three tests. The alternator must carry the running load continuously without overheating. It must hold the voltage within limits when the largest motor starts, because a direct-on-line motor briefly draws six to seven times its running current at a poor power factor. And the engine must pick up the power demanded during that start without stalling or dropping too far in speed.

The calculator computes the kVA each test requires, takes the largest, and rounds up to a standard genset size. It shows which test decided the size, so you can see whether a soft starter or a drive would let you buy a smaller set.

The formula

Running kVA = kW ÷ PF Required (running) = running kVA × (1 + margin) × (1 + 0.5 × non-linear share) ÷ duty factor duty factor = 1 for standby, 0.8 for prime

Motor running kVA = motor kW ÷ (η × PF) Motor starting kVA = running kVA × starting-current multiple

Voltage dip ≈ x″d × S_start ÷ (S_gen + x″d × S_start) → S_gen ≥ x″d × S_start × (1 − dip) ÷ dip

Engine kW at start = S_start × starting PF + other running kW ≤ 1.1 × (S_gen × 0.8)

Default starting-current multiples: 6.5 for direct-on-line, 2.2 for star-delta, 3.5 for soft starters and 1.2 for drives. The starting power factor of an induction motor on DOL is low, about 0.3–0.4, which is why the engine sees much less kW than the kVA figure suggests. The subtransient reactance x″d of small and medium alternators is typically 0.12–0.20 per unit.

Worked example

The defaults describe a 60 kW standby load at PF 0.85, 10% of it non-linear, with a 15 kW motor started direct-on-line, a 20% dip limit and a 15% design margin.

  1. Running load: 60 ÷ 0.85 = 70.6 kVA. With margin and the non-linear allowance: 70.6 × 1.15 × 1.05 = 85 kVA.
  2. Motor running kVA: 15 ÷ 0.78 = 19.2 kVA. Starting kVA at 6.5×: 125 kVA.
  3. Voltage dip test: 0.15 × 125 × 0.8 ÷ 0.2 = 75 kVA.
  4. Engine test: during the start the engine supplies 125 × 0.35 = 44 kW for the motor plus 45 kW for everything else, about 89 kW. An 80 kW (100 kVA) engine with 10% transient capacity gives only 88 kW, so the calculator moves up to 125 kVA.

Switch the starting method to a soft starter and the starting kVA falls to about 67 kVA. The engine test then needs 82 kVA and a 100 kVA set is enough. A drive brings it down to the running-load requirement of 85 kVA, still 100 kVA standard. This is the usual trade-off: the soft starter costs much less than the step up in generator size.

Typical starting current

Starting method Starting current Starting torque Comment
Direct-on-line 6–7.5 × FLC 150–250% Simplest; hardest on generators
Star-delta 2–2.5 × FLC ≈ 33% of DOL Current peak at changeover
Soft starter 3–4 × FLC adjustable Good for pumps and fans
Variable-speed drive 1–1.5 × FLC up to 150% Smallest generator; adds harmonics

For North American motors, the NEMA code letter on the nameplate gives the locked-rotor kVA per horsepower, which you can turn into a multiple.

How to read the results

  • Recommended generator is the standard kVA size that passes all three tests. Its kW rating is 80% of the kVA.
  • Voltage dip on this set shows what the chosen generator will actually do when the motor starts. The bar chart colours sizes that meet your limit.
  • Running load on the set should normally stay between 40% and 80%. Long running below 30% risks wet-stacking.
  • Diesel use is a quick estimate at the running load. The generator fuel calculator gives the full fuel curve and cost per kWh.

Limitations

This is a screening method. Real voltage dip depends on the automatic voltage regulator, excitation system (PMG or shunt), engine governor and turbocharger response. Manufacturers’ sizing tools model these with tested motor-starting curves and ISO 8528-5 transient classes. Several motors starting together, lifts, X-ray machines and large UPS loads need special care. Altitude and high ambient temperature derate both engine and alternator. Use this result to shortlist a size, then confirm with the supplier.

Method & assumptions

Running kVA = kW ÷ PF, increased by the design margin, by 0–50% for non-linear loads and by 1/0.8 for prime duty. Motor starting kVA = motor kW ÷ (η × PF) × starting current multiple. Transient voltage dip ≈ x″d Sstart ÷ (Sgen + x″d Sstart), so the generator needed for a dip limit d is Sgen ≥ x″d Sstart (1 − d) ÷ d. The engine must also carry the kW during the start = Sstart × starting PF + other running kW, with up to 10% transient overload of its kW rating (kVA × 0.8). The chosen set is the next standard size above the largest requirement.

Frequently asked questions

How do I size a generator for my loads?
Add up the kW of everything that runs at the same time, divide by the power factor to get kVA, and add a margin of 10–25%. Then check the largest motor: its starting kVA (often 6–7 times its running kVA for direct-on-line starting) must not cause an unacceptable voltage dip or overload the engine. The generator is the larger of the two requirements, rounded up to a standard size.
What size generator do I need to start a motor?
As a rule of thumb, a direct-on-line motor needs a generator of about 3–5 times its kW rating if nothing else is running, less with a soft starter or star-delta starter, and only about 1.2–1.5 times with a variable-speed drive. The calculator works it out from starting kVA, the allowed voltage dip and the engine's ability to take the load.
What is the difference between standby and prime generator ratings?
Standby rating (ISO 8528 ESP) is for emergency use when the grid fails, with limited yearly hours and an average load of about 70% of the rating. Prime rating (PRP) is for unlimited hours where there is no grid, with a 10% overload allowed for 1 hour in 12. The prime rating of a set is typically about 90% of its standby rating, and many designers size prime sets so the average load stays below 70–80%.
Why are generators rated in kVA and not kW?
The alternator is limited by current (heating) and the engine by kW. Manufacturers quote kVA at a power factor of 0.8, so a 100 kVA generator delivers 80 kW. Loads with a power factor below 0.8 can overload the alternator before the engine reaches full power.
How much voltage dip is acceptable when a motor starts?
Around 15% where there are sensitive electronics, lifts or lighting, and 20–30% for motor-only loads. Above roughly 30–35%, contactors can drop out and the motor may not accelerate. Larger alternators, soft starters and drives all reduce the dip.
Can I run a generator at very low load?
Diesel engines running below about 30% load for long periods suffer wet-stacking: unburnt fuel and soot build up in the exhaust. Avoid a large oversize for motor starting alone; a soft starter or drive is often cheaper than a much bigger generator.

Sources & references

  1. ISO 8528-1 and 8528-5 — Reciprocating engine driven generating sets: ratings and transient performance
  2. IEEE Std 446 (Orange Book) — Emergency and Standby Power Systems
  3. NEMA MG 1 — Motors and Generators (locked-rotor kVA code letters)
  4. Caterpillar — Generator set sizing and motor starting (Application & Installation Guide)

Embed this calculator

Free for blogs, installers, schools and NGOs. Copy the code below; it updates itself automatically.