A uranium fuel pellet the size of a fingertip holds about as much energy as a tonne of coal. Getting it there takes a long chain of steps across several continents: mining, milling, chemical conversion, enrichment, fabrication, years in a reactor, and then storage or reprocessing. Each step has a small number of suppliers, which is why the fuel cycle has become a geopolitical issue since 2022. This guide follows the uranium from the ground to the spent fuel pool, with typical quantities and costs.
Step 1: mining and milling
Uranium is fairly common in the Earth’s crust, about as abundant as tin. Economic deposits are much rarer. World mine output was about 49,000 tonnes of uranium (tU) in 2022 according to the World Nuclear Association (WNA), while reactors needed around 65,000 tU. Stockpiles, recycled material and down-blended weapons uranium have filled the gap.
| Country | Mine output 2022 (tU) | Share of world | Main method |
|---|---|---|---|
| Kazakhstan | ~21,200 | ~43% | In-situ recovery |
| Canada | ~7,400 | ~15% | Underground (very high-grade Athabasca ores) |
| Namibia | ~5,600 | ~11% | Open pit |
| Australia | ~4,600 | ~9% | Underground / by-product of copper (Olympic Dam) |
| Uzbekistan | ~3,300 | ~7% | In-situ recovery |
| Russia | ~2,500 | ~5% | Underground |
| Niger, China, others | ~4,700 | ~10% | Various |
Source: WNA, rounded. Production rose in 2023–2024 as Canada’s McArthur River and Kazakhstan’s mines ramped up, though Kazatomprom has repeatedly trimmed targets because of sulphuric acid shortages. See the Kazakhstan and Canada profiles.
More than half of world uranium now comes from in-situ recovery (ISR, also called in-situ leaching). Instead of digging, operators pump a weak acid or alkaline solution through a porous ore-bearing aquifer, dissolve the uranium and pump it back up. Conventional mines crush ore and leach it in a mill. Either way, the product is yellowcake, mostly U₃O₈, packed in drums. Market prices are quoted per pound of U₃O₈.
Step 2: conversion
Enrichment plants work with a gas, so yellowcake is purified and converted into uranium hexafluoride (UF₆), which is solid at room temperature and turns into gas at about 56 °C. Only a handful of commercial converters exist: Cameco (Canada), Orano (France), ConverDyn (US), Rosatom (Russia) and CNNC (China). Conversion is cheap relative to other steps but has been a bottleneck, and conversion prices roughly tripled between 2020 and 2024.
Step 3: enrichment and the SWU
Light-water reactors need 3–5% U-235, against 0.711% in natural uranium. Gas centrifuges spinning at tens of thousands of rpm separate the slightly lighter U-235 molecules from U-238. The output is an enriched product stream and a larger stream of depleted uranium (“tails”) with around 0.2–0.3% U-235.
Enrichment effort is measured in separative work units (SWU). The uranium enrichment glossary entry explains the concept.
Example: 4.5% fuel, 0.25% tails, 0.711% feed F / P = (4.5 − 0.25) ÷ (0.711 − 0.25) = 4.25 ÷ 0.461 ≈ 9.2 kg natural U per kg of fuel Separative work ≈ 6.9 SWU per kg of 4.5% product
Annual reload for a 1,000 MWe reactor ≈ 25 t of 4.5% fuel → ≈ 230 t natural uranium (≈ 270 t U₃O₈) and ≈ 170,000 SWU
Raising the tails assay saves SWU but needs more uranium; operators shift the balance with relative prices. World enrichment capacity is roughly 60 million SWU a year. Russia’s Rosatom holds about 40–45% of it, Urenco (UK, Netherlands, Germany, US) roughly 30%, with Orano and CNNC making up most of the rest (WNA). In 2024 the United States banned imports of Russian enriched uranium, with case-by-case waivers allowed through 2027, and Russia answered with export restrictions of its own. Western capacity expansions at Urenco and Orano will take until around 2030 to come fully online.
Step 4: fuel fabrication
Enriched UF₆ is converted to uranium dioxide powder, pressed into pellets about 1 cm across, and baked into a hard ceramic. Pellets go into zirconium-alloy tubes about 4 m long, which are bundled into fuel assemblies. Fabrication is specific to each reactor design, so a utility cannot easily switch suppliers. That is why Ukraine and several EU countries running Russian-designed VVER reactors spent years qualifying Westinghouse fuel as an alternative.
Step 5: in the reactor, and burnup
Fuel assemblies stay in a reactor for around four to six years, with a third or a quarter of the core replaced at each refuelling outage. How much energy they give before removal is called burnup, measured in gigawatt-days per tonne of heavy metal (GWd/tHM).
| Era / reactor | Typical discharge burnup |
|---|---|
| Early LWRs (1970s) | ~30 GWd/t |
| Modern LWRs | ~45–60 GWd/t |
| CANDU (natural uranium) | ~7–8 GWd/t |
When spent fuel comes out, roughly 95% of it is still uranium (now around 0.8–1% U-235), about 1% is plutonium, and 3–5% is fission products and minor actinides. See burnup and spent fuel.
Step 6: reprocessing or storage
Most countries use an open (once-through) cycle: spent fuel cools in pools for several years, then moves to dry casks and eventually a deep repository. A few close the cycle partly by reprocessing. Orano’s La Hague plant in France separates uranium and plutonium from roughly 1,000 tonnes of spent fuel a year. Plutonium goes into mixed-oxide (MOX) fuel, which supplies roughly 10% of France’s nuclear electricity, and the remaining high-level waste is vitrified in glass. Russia, China, India and Japan (Rokkasho, still not in commercial operation after decades of delays) also run or build reprocessing plants. Reprocessing cuts the volume and long-term radiotoxicity of high-level waste but costs more than direct disposal at today’s uranium prices. More in Nuclear Waste: The Facts.
HALEU and advanced fuels
Many small modular reactor and advanced designs, such as TerraPower’s Natrium and X-energy’s Xe-100, need high-assay low-enriched uranium (HALEU) at 5–20% U-235. Higher enrichment allows smaller cores and longer refuelling intervals. Until recently, Russia was the only commercial source. Centrus Energy produced the first US HALEU, 20 kg, at Piketon, Ohio in late 2023, and the US Department of Energy has contracts to expand supply, but volumes remain far below what announced reactor projects would need in the 2030s.
What uranium costs, and why it barely matters for power prices
The spot price of uranium is volatile. It spiked to about $136/lb U₃O₈ in mid-2007 after a flood at Canada’s Cigar Lake mine, collapsed after Fukushima to below $20/lb in late 2016, then climbed back above $100/lb in early 2024 before easing to roughly $65–80/lb through 2025 (UxC, TradeTech and Cameco data). Most utilities buy on multi-year contracts, so they rarely pay spot.
For a reactor, the total fuel cost (uranium, conversion, enrichment and fabrication) usually comes to about 0.5–1 US cent per kWh. Raw uranium is only a part of that, so doubling the uranium price raises nuclear generating costs by roughly 5–10%. Compare that with a gas plant, where fuel can be 70–80% of the running cost. That stability is one reason governments value nuclear for energy security.
Fuel cycle in brief
- Mining is concentrated: Kazakhstan, Canada, Namibia and Australia produce about three-quarters of world uranium.
- Conversion and enrichment are narrower still, with Russia holding about 40% of enrichment capacity.
- One large reactor needs about 200 tonnes of natural uranium a year to make some 8 TWh of electricity.
- Fuel cost is small per kWh, so uranium price spikes barely move nuclear electricity costs.
Follow uranium supply, prices and reactor demand on the uranium hub and nuclear energy hub, or convert between tonnes, pounds and energy units with the energy unit converter.
Calculators for this topic
Frequently asked questions
Which countries produce the most uranium?
What is yellowcake?
What is a SWU?
How much uranium does a reactor use?
What is HALEU?
Why did uranium prices rise after 2021?
Sources & references