Carbon capture and storage takes carbon dioxide from a smokestack or industrial process, compresses it and pumps it deep underground, where it stays. The technology has worked at scale since 1996. It also has a long list of projects that were cancelled, ran over budget or captured less than promised. Climate scenarios from the IPCC and IEA nearly all rely on it for cement, chemicals and some power, so it matters to get the facts straight. This guide covers how capture works, what the real projects show, what it costs, and where direct air capture fits.
The three steps: capture, transport, storage
Capture separates CO₂ from other gases. Transport moves it, usually as a dense compressed fluid by pipeline, sometimes by ship. Storage injects it more than about 800 m underground, where pressure keeps it in a dense, liquid-like state, into porous rock sealed by an impermeable cap rock. The CCS glossary entry has the short definition. When the CO₂ is used rather than stored, for example in enhanced oil recovery, drinks or chemicals, people add a U: CCUS.
Three ways to capture CO₂
| Route | How it works | Where it fits | Typical capture rate |
|---|---|---|---|
| Post-combustion | Flue gas passes through an amine solvent that absorbs CO₂; heating the solvent releases pure CO₂ | Existing coal and gas plants, cement, waste-to-energy | 85–95% (design), often lower in practice |
| Pre-combustion | Fuel is converted to hydrogen and CO₂ (gasification or reforming), and CO₂ is removed before combustion | Hydrogen and ammonia plants, IGCC power | 60–95% depending on design |
| Oxy-fuel | Fuel burns in pure oxygen, leaving mainly CO₂ and water vapour | New-build plants, cement kilns (pilot stage) | Up to ~90%+ |
There is also the “free” case: natural gas processing. Many gas fields contain several percent to over 50% CO₂, which must be removed before the gas can be sold or liquefied. That CO₂ is already separated, so storing it costs relatively little. A large share of the CCS operating today is this kind.
The energy penalty is the catch for power plants. Regenerating the solvent takes a lot of steam. A coal plant with post-combustion capture loses roughly 20–30% of its net output, which means it burns more coal per kWh sold.
Coal plant without capture: 0.85 kg CO₂/kWh at 40% efficiency With capture: efficiency drops to ~30% → 0.34 ÷ 0.30 ≈ 1.13 kg CO₂ produced per kWh Capture 90% → 1.13 × 0.10 ≈ 0.11 kg CO₂/kWh emitted
Avoided = 0.85 − 0.11 ≈ 0.74 kg/kWh, about 87% of the original emissions Plus upstream methane from extra coal mined (not counted here)
The gap between captured and avoided widens further when capture runs below design. Try how emissions change with plant efficiency in the electricity CO₂ calculator.
What real projects have done
| Project | Country, start | Source of CO₂ | Design capacity | Track record |
|---|---|---|---|---|
| Sleipner | Norway, 1996 | Gas processing | ~1 Mt/yr | Over 20 Mt stored under the North Sea, monitored with seismic surveys; no leakage detected |
| Snøhvit | Norway, 2008 | LNG feed gas | ~0.7 Mt/yr | Needed a new injection well after reservoir pressure rose faster than expected |
| Boundary Dam 3 | Canada, 2014 | Coal power (115 MW unit) | ~1 Mt/yr | Averaged well below design in early years; more than 6 Mt captured by 2024, mostly sold for EOR |
| Quest | Canada, 2015 | Hydrogen for oil sands upgrading | ~1 Mt/yr | Has broadly met targets, more than 8 Mt stored by 2024 |
| Petra Nova | US, 2017 | Coal power | ~1.4 Mt/yr | Mothballed in 2020 when oil prices fell; restarted in 2023 |
| Gorgon | Australia, 2019 | LNG feed gas | ~3.4–4 Mt/yr | Injected roughly a third to half of target in its first five years due to water handling and pressure problems |
| Northern Lights | Norway, 2025 | Shipped industrial CO₂ | 1.5 Mt/yr (phase 1) | First injection in 2025; first open-access cross-border storage |
Figures from operator reports, the Global CCS Institute and IEEFA, rounded. The pattern: projects capturing concentrated CO₂ from gas processing or hydrogen production mostly perform; capture from power plant flue gas has struggled with reliability and cost. Chevron had to buy offsets to cover Gorgon’s shortfall against its environmental approval.
How big is CCS today?
The Global CCS Institute’s 2024 report counted about 50 operating facilities with roughly 50 Mt of CO₂ capture capacity a year, and several hundred more in various stages of development. Global energy-related CO₂ was about 37.8 Gt in 2024 (IEA). So operating CCS handles around 0.13% of emissions. The IEA’s net zero scenario needs over 1 Gt a year by 2030, a twentyfold increase that looks very unlikely on current progress. Historically, the IEA notes, most announced capacity has not been built on schedule.
What it costs
| CO₂ source | Approx. capture cost ($/t CO₂) |
|---|---|
| Natural gas processing, ethanol, ammonia (concentrated streams) | 15–35 |
| Hydrogen from steam methane reforming | 50–80 |
| Cement, steel | 60–120 |
| Coal and gas power plants | 50–120 |
| Direct air capture (current plants) | 400–1,000+ |
Indicative ranges from IEA and IPCC AR6 WGIII; transport and storage add roughly $10–30/t depending on distance and site. These numbers show where CCS makes economic sense: when a carbon price or subsidy exceeds the cost. The US 45Q tax credit pays up to $85/t for geological storage and $180/t for direct air capture, which drove most recent US announcements. In the EU, carbon allowances around €60–90/t in 2024–2025 make some industrial capture viable when combined with grants. See carbon pricing explained and the carbon price tracker.
Direct air capture
Direct air capture (DAC) pulls CO₂ from ambient air, where it is only about 0.04%. That makes it far more energy-intensive than capture from flue gas. Climeworks’ Orca plant in Iceland (2021) is rated at 4,000 t/yr and its Mammoth plant (2024) at 36,000 t/yr; both have reportedly captured far below those figures in early operation. Occidental’s 1PointFive is building Stratos in Texas, designed for up to 0.5 Mt/yr. DAC is a way to remove past emissions, not a substitute for cutting current ones. At $500 per tonne, removing one year of a typical European’s 7 tonnes would cost $3,500. Estimate your own footprint with the carbon footprint calculator.
CCS in Malaysia and Southeast Asia
Malaysia has many offshore gas fields with high CO₂ content, so CCS is a practical engineering issue there as well as a climate one. PETRONAS’s Kasawari CCS project offshore Sarawak will separate CO₂ from gas at the Kasawari field and inject it into a depleted reservoir nearby. It is designed for about 3.3 Mt a year, which would make it one of the largest offshore CCS projects in the world, with start-up targeted for the second half of the 2020s. PETRONAS has also signed agreements with Japanese and Korean companies to study importing their CO₂ for storage in Malaysian reservoirs.
Sarawak passed a state CCS law in 2024 and the national CCUS Act followed in 2025. Indonesia issued CCS regulations in 2023–2024 that allow storage of imported CO₂. Both countries want to be regional storage hubs for Japan, Korea and Singapore, which have little storage capacity of their own. See the Malaysia profile and Malaysia’s energy transition.
Where CCS earns its place
- Strong case: gas processing, hydrogen and ammonia plants, ethanol, cement (where about 60% of emissions come from limestone chemistry, not fuel), waste incineration.
- Weaker case: coal and gas power, where wind, solar, storage and nuclear often cut emissions more cheaply and reliably.
- Watch for: projects that count captured CO₂ used for oil recovery as fully stored, and capture rates quoted at design rather than actual.
Summary
CCS works technically, and geological storage has a good safety record. Its weakness is economic and operational: only about 50 Mt a year is captured, power-sector projects have mostly disappointed, and costs below $50/t are limited to concentrated streams. For heavy industry it will probably be needed; for electricity, cheaper options usually come first. Compare sources on the carbon intensity guide and track coal plants on the coal hub.
Calculators for this topic
Frequently asked questions
How much CO₂ is captured with CCS today?
What does carbon capture cost?
Is stored CO₂ likely to leak?
Why do some CCS projects underperform?
Is enhanced oil recovery a form of CCS?
Does Malaysia have CCS projects?
Sources & references
- Global CCS Institute — Global Status of CCS 2024
- IEA — CCUS projects explorer and Direct Air Capture 2022
- IPCC (2005) Special Report on Carbon Dioxide Capture and Storage; IPCC AR6 WGIII (2022)
- Institute for Energy Economics and Financial Analysis (IEEFA) — The carbon capture crux (2022)
- Equinor / Northern Lights — Sleipner and Longship CO₂ storage
Figures in this guide are typical ranges drawn from the sources above; your own numbers depend on location, prices and equipment. Use the linked calculators for site-specific estimates.