Glossary · Oil & gas

Regasification

Warming LNG back into gas at an import terminal so it can be sent into pipelines, usually by seawater or gas-fired vaporisers.

Import terminals store LNG in insulated tanks and pump it to vaporisers. Open-rack vaporisers run seawater over aluminium panels; submerged combustion vaporisers burn about 1.5% of the gas for heat. Regasification uses far less energy than liquefaction.

Global regasification capacity is well above liquefaction capacity, giving importers flexibility. Malaysia runs import terminals at Sungai Udang, Melaka, and Pengerang, Johor, to supply Peninsular demand. See FSRU.

Related terms

All terms →
  • FSRU (floating storage and regasification unit)

    A ship that stores LNG and regasifies it on board, allowing a country to start importing LNG within months rather than years.

  • LNG (Liquefied Natural Gas)

    Natural gas cooled to about minus 162 degrees C, shrinking its volume around 600-fold so it can be shipped by tanker between markets without pipelines.

  • LNG liquefaction train

    A processing line that cleans natural gas and chills it to about −162 °C, turning it into LNG; plant capacity is quoted in million tonnes per year (Mtpa).

  • City gate

    The point where a high-pressure transmission pipeline hands natural gas to a local distribution network, after pressure reduction, metering and odorisation.