Ramp rate
How quickly a power plant or other resource can raise or lower its output, usually in MW per minute or percent of capacity per minute.
Typical ramp rates: open-cycle gas turbines and reciprocating engines 10–20%/min or more; combined-cycle plants 2–8%/min; coal 1–4%/min; nuclear designed for load following around 1–5%/min within limits; hydro over 20%/min; batteries effectively 100% in under a second.
Fast ramping matters more as wind and solar grow, because net load changes quickly. See baseload, peaking and flexibility.
Related terms
All terms →- Net load
Electricity demand minus variable wind and solar output: the load that dispatchable plants, storage and imports must cover.
- Minimum stable load
The lowest output at which a thermal power plant can run continuously without shutting down, often 25–50% of its rated capacity.
- Load following
Adjusting a power plant’s output over minutes to hours to track changes in electricity demand or in variable renewable generation.
- Open-cycle gas turbine (OCGT)
A simple-cycle gas turbine that exhausts hot gas directly to the atmosphere, trading lower efficiency (33–42%) for fast start and low capital cost, used mainly for peaking.