Demand charge (maximum demand)
A charge based on a customer’s highest power draw in kW during a billing period, common for commercial and industrial users.
Networks and generators must be sized for peaks, so many tariffs bill the highest 15- or 30-minute average demand in the month, in currency per kW, on top of energy charged per kWh. For a factory or office, demand charges can be 20–50% of the bill. Malaysian commercial and industrial tariffs call this the maximum demand (MD) charge.
Staggering motor start-ups, controlling EV charging and using batteries for peak shaving all reduce it. See how to read your electricity bill.
Related terms
All terms →- Time-of-use (ToU) tariff
An electricity tariff with different prices for set periods of the day, such as peak and off-peak, to encourage use when power is cheaper to supply.
- Peak load
The highest electricity demand recorded on a grid during a given period, which sets the capacity the system must be able to supply.
- Power vs energy (kW vs kWh)
Power (kW) is the rate of energy flow at an instant; energy (kWh) is power accumulated over time. Capacity is measured in power, output in energy.
- Demand response
Changes in electricity consumption by end users, in response to price signals or operator requests, to balance the grid.