Results

Lifting 250 kW from PF 0.78 to 0.95 needs 118.4 kVAr of capacitors (a 125 kVAr bank). Current drops from 463 A to 380 A, freeing 57 kVA of supply capacity. Savings of about 786 € a month pay back the bank in 4.8 months.
Capacitor required
118.4kVAr
nearest standard bank: 125 kVAr
Capacitance per phase (delta)
785µF
2,355 µF per phase in star
Current before
463A
Current after
380A
−18%
Apparent power before
321kVA
Apparent power after
263kVA
Reactive power before
201kVAr
82 kVAr after
Cut in I²R losses
33%
Tariff saving per month
€688
57.4 kVA less maximum demand
Loss saving per month
€97.76
Capacitor bank cost
€3,750
Simple payback
4.8months
9,432 € saved per year
kVAr needed vs target power factor
Current and kVA before and after

kVAr per kW multiplier (tan φ1 − tan φ2)

Present PFto 0.9to 0.92to 0.95to 0.98to 1
0.60.8490.9071.0051.131.333
0.650.6850.7430.840.9661.169
0.70.5360.5940.6920.8171.02
0.750.3980.4560.5530.6790.882
0.80.2660.3240.4210.5470.75
0.850.1350.1940.2910.4170.62
0.9—0.0580.1560.2810.484
  • Where many variable-speed drives, inverters or other harmonic sources are present, use detuned (reactor-protected) capacitor banks or active filters to avoid resonance.
  • Correct to 0.95–0.98 rather than 1.0: at light load a fixed bank can push the PF leading and raise the voltage. Automatic stepped banks track the load.

Free calculator by Energy.co.my