PUE is 1.48: for every kWh used by IT equipment, the facility draws 1.48 kWh in total. Annual consumption is 12,970 MWh, of which 4,210 MWh is overhead, costing 505,247 €. At a PUE of 1.3 the same IT load would save 189,887 € and 725 t CO₂ a year.
PUE
1.48
DCiE 67.5%
Facility power
1,481kW
Annual energy
12,970MWh
8,760 MWh for IT
Annual electricity cost
1.6million €
Cost of overhead
€505,247
cooling, power losses, building
Cost per kW of IT per year
€1,556
Saving at target PUE
€189,887
1,582 MWh per year
CO₂ per year
5,940t
Water per year
15,768m³
WUE 1.8 L/kWh
Where the power goes (kW)
Annual electricity cost vs PUE (€)

Energy balance

ComponentkWMWh/yrShare
IT equipment1,0008,76067.5%
Cooling375.53,29025.4%
UPS losses65.15704.4%
Transformers & PDUs201751.4%
Lighting & other201751.4%
  • PUE per ISO/IEC 30134-2 is measured over a full year at the facility meter; this tool uses average powers. With a known PUE the overhead split shown is illustrative (70% cooling).
  • Water use depends heavily on the cooling design and climate; enter your WUE (ISO/IEC 30134-9). CO₂ uses the selected country's average grid intensity.

Free calculator by Energy.co.my